The installation of new kitchen cabinet doors and drawers takes approximately 3 to 6 days depending on the size of your kitchen.
Step One:
Doors, drawers and accessories are carefully removed. Countertops, floors, and appliances are covered.
Step Two:
Exterior cabinet surfaces are cleaned and prepared for installation of your selected materials.
Step Three:
Custom-made doors and drawers are installed using concealed hinges and new drawer slides. Additional hardware and accessories are added based on your kitchen and design selection.
Step Four:
Finally, we will ask you to walk through the kitchen with us to complete an inspection checklist to ensure that your original order has been completed and properly installed. A Cabinet Makeover by Furniture Medic provides high quality designs at an economical price.